strategic-alliances Skill
构建能改变业务能力的合作伙伴关系——技术集成、渠道与经销商安排、合资企业以及 OEM 关系。用于评估或构建战略伙伴关系、在合作与自建之间做决策、谈判联盟的商业条款,或诊断已签约却不见产出的合作关系。如涉及借力受众的营销合作,请使用 `marketing:partnership-marketing`。
安装方式:把技能目录放入 ~/.claude/skills/(Claude Code)或在 claude.ai 设置中启用;也可复制右侧安装命令一键添加。
技能指令原文(SKILL.md)
Strategic alliances
Distinct from marketing partnerships. Those borrow an audience; these change what the business can
do or where it can sell.
Partner, build, or buy
Partner when the capability is genuinely outside your core, the partner is materially better at it,
and the arrangement can be unwound. Build when it is core, or when depending on someone else creates
unacceptable exposure. Buy when you need control and speed and the thesis holds.
The question that decides it: **what happens if this partner becomes a competitor, is acquired by
one, or simply loses interest?** If the answer is existential, do not partner — that is a build or
buy decision wearing a cheaper price tag.
Structure by what each side actually wants
Partnerships fail on asymmetry of motivation more than on terms. Before structuring, establish what
the partner gets, whether it is material to them, and who inside their organization is accountable
for it.
A partnership that is strategically important to you and a rounding error to them will not be
executed, whatever was signed. Being the small partner is workable — being the small *and
uninteresting* partner is not.
Terms that determine whether it works
- Exclusivity — expensive, occasionally worth it, and always time-boxed. Perpetual exclusivity
given away early is a recurring regret.
- Economics — who books revenue, on what split, and what happens to it if volume grows tenfold.
- Roadmap commitments — what each side will build and by when, with a remedy if they do not.
- Data — what flows where, under what basis, and what happens to it at termination.
- Customer ownership — who holds the relationship, and who may market to them afterward. Most
disputed, most often left vague.
- Termination and transition — notice, and what continues for customers mid-contract. Negotiate
the exit while everyone is friendly, because it will not be negotiable later.
Making it produce
Signed is not launched. Partnerships need a named owner on each side, a joint plan with dates, and a
regular review that either side can bring problems to.
The characteristic failure: a signed agreement, a press release, and no operational plan. Six months
later both sides believe the other did not deliver, and neither is wrong.
Enable the partner properly. Their team needs to know what to say and when to bring you in, and they
will not learn it from the contract.
Diagnosing a stalled partnership
Almost always one of: no accountable owner on one side, misaligned incentives at the level of the
people doing the work, a promised technical dependency that never shipped, or a partner whose
strategy moved.
Say it plainly and early. Partnerships die quietly for a year before anyone admits it, and that year
is the cost.
Never
- Sign a partnership without naming what each side is measured on.
- Announce before the joint work has a named owner on both sides.
- Let a partnership run past its review date on goodwill.
- Grant exclusivity without a performance floor that ends it.